You must be a ticket holder to proceed
Ticket holders must sign in to LeadDev.com with exactly the same email address as stated on your ticket.
Do you have a LeadDev.com account matching the email address on your ticket?
My email is not recognised or, having signed in, it says I do not have access to the content
Double check your ticket to make sure that you are trying to access with the correct email address (see below for where to find your ticket).
If you're sure that the ticket is correct, get in touch via Slack and we'll investigate for you
The verification email does not arrive
Check your spam and/or junk folders for the email. We know that some corporate email firewalls block our emails, and in this case you'll need to get in touch (see below) for us to move your ticket to an alternative email address.
The verification email link does not work
The links are time limited, so make sure you've tried in the last few minutes. If not, some corporate email firewalls have occasionally corrupted the verification links, and in this case you'll need to get in touch (see below) for us to move your ticket to an alternative email address.
Where can I find my ticket?
Your ticket will have been emailed to you from support@tito.io (Tito is our ticketing provider). If you don't have an email from Tito with your ticket, check with the person who made the booking originally. Otherwise, get in touch and we'll be able to help.
Getting help
The quickest way to get support is via our #help-desk channel on Slack (not a member of LeadDev Slack? join here.)
You can also email hello@leaddev.com although response times will be slower.
Waterloo International station was opened in 1994 serving Eurostar trains through the channel tunnel to France. The station cost £130 million to build and won the EU prize for contemporary architecture but closed just 13 years later in 2007.
What happened?
Waterloo was just a temporary solution for a cash-strapped British Rail looking to provide an international service. The government had made it clear they would not pay for a dedicated new railway line and Waterloo could connect to existing lines into Kent and accommodate the extra trains and platforms.
It was a far from ideal solution, but it allowed Eurostar trains to start running with the opening of the channel tunnel. Eurostar proved to be a massive success and later on, the case for building a proper high-speed line was successfully made. This came at a cost of over £7.5 billion.
As software engineers, we’re reluctant to build short-term tactical solutions that subsequently need to be torn down and replaced with a ‘proper’ solution. The short-term solution is often heavily criticised (and often rightly so) because of the pain of the migration and cleanup. However tactical tech has an important part to play and can inform much bigger and more expensive decisions. A ‘hacky’ solution can mean you’re getting data from real customers much sooner and unearthing details would have otherwise remained unknown.